| BILL OF MATERIALS
FORMAT
The information for the BOM (DA Form 2702) is taken from the materials
estimate list. The BOM
is used to requisition these materials. The materials estimate list contains
information on
materials needed for a project, but it also contains much information
on materials needed for a
project, but it also contains much information of little interest to depot
personnel. Therefore, use
the simplified BOM (DA Form 2702, Figure 3-2) to requisition materials.
The rest of the building would be analyzed in the same way.

|